PRESS ARCHIVE

Layher Allround Shoring TG 60 ideal for tight schedules11/30/2012

1435955_layherallr.jpgIn the construction of two motorway bridges in Finland, the time factor played a major role. In order to keep to the tight schedules, the construction company decided to use for the first time the Layher Allround Shoring TG 60. Fitted by a specialist scaffolding company, the shoring system could be realized both quickly and optimally adapted to the course of the road – an efficient solution.

more information

Layher closes Berlin's Kaiser Wilhelm Memorial Church11/19/2012

1435552_layherprot.jpgSafe and yet economical renovation of a memorial: During renovation works at the Kaiser Wilhelm Memorial Church in Berlin, the Layher Protect System installed by Gerüstbau Tisch not only protects pedestrians efficiently against falling objects, but thanks to effective weather protection also ensures a smooth process of the restoration – and at the same time provides an attractive appearance of the inner-city construction site.

more information

Layher Cassette Roof protects Stork’s Nest10/31/2012

1435225_layherkass.jpgCost-efficient site protection: When redeveloping a water tower in Espoo (Finland), the scaffolders not only protected the building site effectively against weather influences by quickly assembling a more than 1,000 square metres large temporary Layher cassette roof, but also prevented possible interruptions of construction with this – for more efficiency.

more information

Fulda Monument under the hood10/19/2012

1434971_layherkass.jpgCost effectiveness is a major issue: For the roof renovation of the City Palace in Fulda, scaffolding company WEMO-tec relies on the Layher Cassette Roof for weather protection. Quickly erected, the temporary roofing solution provides a dual benefit: It not only prevents possible disruptions of the renovation due to poor weather conditions, but also protects the historic rooms effectively against rain and snow. Thus, a continuous operation in the castle is guaranteed.

more information

Economical scaffolding at an altitude of 40 metres9/14/2012

1433930_layherallr.jpgIn order not to impair the production operation at the Rogesa on the site of the Dillinger Hütte by corrosion protection measures on a gas downspout, Rende Gerüstbau began the assembly of the scaffold only at an altitude of 40 metres. The use of the Layher Allround Bridging System as a support beam for the work scaffolding provided here for a material-saving and efficient solution.

more information

1, 2 or 3 – the ideal Shoring System for every Construction Phase9/6/2012

1433679_layherallr.jpgLayher Allround Shoring Tower TG 60 scores again: Thanks to quick assembly and high versatility, the scaffolding company Karl was not only able to speed up the construction sequence during the expansion of Nuremberg’s Dürer Grammar School, but at the same time created the ideal prerequisites for the construction of a new gymnasium and additional classrooms.

more information

Site protection moves along8/30/2012

1433507_layherkede.jpgEfficient use: The movable version of the new, aesthetic Layher Keder Roof XL did not only quickly ensure weather-independent construction works for the sectional glass roof restoration at a British shopping centre, but also an uninterrupted shopping operation.

more information

Superlative Weather Protection – the Layher Keder Roof XL8/27/2012

1433379_layherkede.jpgQuick assembly, low weight and appealing design: the Layher Keder Roof XL. The cost-efficient, lightweight, attractive weather protection is assembled within a very short time. Whether as double-pitch, mono-pitch or polygonal barrel roof, for the use with newly constructed buildings or redevelopments – the Keder Roof XL is a convincing complete solution for roofing with roof widths of up to 40 metres. For more efficiency and aesthetics on building sites.

more information

Heavy loads mastered easily5/11/2012

1429912_layherallr.jpgConvincing use of the new Allround Shoring System TG 60 from Layher for the construction of an automatic high shelf warehouse: Thanks to a sophisticated Allround Shoring system solution made by scaffolding company Postweiler Gerüstbau for a support for wide-spanning troughs, not only the high vertical loads of 25 tons per metre could be easily transferred by standard bundling, but work levels could also be installed quickly and easily to the shoring system.

more information

85 Metres high Layher Stairtower leads to the Olympic „Orbit“5/8/2012

1429736_layhertrep.jpgThe quick and safe way to the top: During the construction of a 115 metres high lookout tower for the 2012 Summer Olympics, a Layher Allround platform stairway tower provided more efficiency in construction progress – and a non-slip access for the construction workers.

more information

Public Relations


For PR inquiries or contacts for press is responsible:

Mrs. Andrea Beisswenger
andrea.beisswenger@layher.com

Telephone: +49 (0)7135 - 70-0
Telefax: +49 (0)7135 - 70-422